Photo Gallery
>> Next page
Sunset from Purna Bridge
Train passing Tavdi
The ground floor and the walls were completed
before the end of 2001. In January, preparations
were underway to put the roof concrete
slab, which will carry the Ghumat (dome)
of the Temple. At 24 feet above ground
level, the slab will be higher than the
Old Temple.
>> Next page
Home page | Feedback
form | News | Help
| This page last edited:
19-Oct-2006
|